Cipher Digital

CIFR  ·  Data Center Landlord  ·  New York, NY
cipherdigital.comInvestor relations ↗
Grid powerWholesale HPC ColocationEx-Bitcoin miner▲ BULLISH · Q2 2026
$15.17
-9.5% today
5.3
TOTAL GW
0.21
OPERATIONAL
0.70
SECURED
4.39
ANNOUNCED
$6.3B
MKT CAP
$1.2B
VAL / GW
01

Overview

Cipher Digital Inc. (Nasdaq: CIFR; formerly Cipher Mining, rebranded February 2026) is a West Texas power-and-land developer pivoting from Bitcoin self-mining to wholesale HPC colocation. It originates power, builds substations and cooled shells, and leases them to hyperscalers who bring their own compute.

Its grid interconnections — finalized before ERCOT's PGRR145 'Batch 0' lockdown — are a competitive moat. The model is asset-light on silicon: long-duration triple-net leases backed by Amazon and Google-backstopped Fluidstack target utility-like cash flows with near-zero GPU-obsolescence risk, at the cost of high pre-revenue leverage during the build.

02

Market Thesis

Cipher's bet is that owning the scarce inputs — grid-connected Texas power and land — while letting tenants own the depreciating GPUs is the lower-risk way to monetize the AI build-out. Triple-net leases backed by investment-grade hyperscalers turn megawatts into bond-like cash flows.

The catalyst is conversion: Barber Lake (September 2026) and Black Pearl (October 2026) flipping from construction to rent commencement. Until then the company carries ~$5B of project debt against a self-mining business in wind-down — the re-rating follows the first hyperscale rent checks, not the announcements.

03

Approach

Cipher originates power and land, builds substations and cooled shells, and leaves the GPUs to the tenant — a wholesale colocation developer sitting near the power end of the spectrum. Long-duration triple-net leases backed by investment-grade hyperscalers (Amazon; Google-backstopped Fluidstack) make it a utility-like infrastructure play with near-zero silicon-obsolescence risk.

04

Key Sites

SITE
LOCATION
CAPACITY
STATUS
Odessa
Ector County, TX
207 MW
OPERATIONAL
Barber Lake
Colorado City, TX
300 MW
SECURED
Black Pearl
Wink, TX
300 MW
SECURED
Stingray
Andrews County, TX
100 MW
SECURED
Reveille
Cotulla, TX
70 MW
ANNOUNCED
Colchis
West Texas
1.0 GW
ANNOUNCED
The 3Ms
Texas & Ohio
1.5 GW
ANNOUNCED
05

Risk

Cipher may fail to complete HPC data center construction on time or within budget, materially harming its business, liquidity, and ability to service debt.
The company is exposed to electricity market risks in ERCOT, including potential changes to large load interconnection rules, grid stability requirements, and curtailment obligations.
Cipher's HPC strategy depends on securing significant capital for construction; an inability to obtain financing could derail development plans.
The business is highly concentrated in Texas, making it vulnerable to regional regulatory changes, market conditions, and natural disasters.
Cipher relies on a small number of HPC tenants (Fluidstack/Google and Amazon) for a significant portion of expected future revenues, exposing it to customer concentration risk.

Developments

Aug 4, 2026▲ BULLISHCurrent report (8-K)SEC 8-K
Accelerated delivery and a new 900 MW option signal speed-to-fiber execution, converting contracted MW into cash-flowing assets faster than the market prices.
also covered by The Globe and Mail · SEC 10-Q
Jun 15, 2026Current report (8-K)SEC 8-K
The financing and operator requirement signal a large-scale, credible data center project, aligning with the thesis of MW near fiber being a scarce asset.
Jun 8, 2026Current report (8-K)SEC 8-K
The $810M debt raise signals capital markets are funding AI data-center buildout, validating the thesis that contracted power assets can attract large-scale financing.
also covered by SEC 8-K
May 5, 2026Current report (8-K)SEC 8-K
Third lease with an investment-grade hyperscaler signals deepening demand for contracted data center capacity, reinforcing the scarcity value of energized MW near fiber.
Feb 4, 2026Black Pearl Compute prices $2.0B of 6.125% senior secured notes due 2031SEC 8-K
Debt financing provides capital for Cipher's data-center buildout but lacks detail on the specific power or fiber assets being funded.
All filings on EDGAR ↗
Share on XCompare CIFRAll companies