IREN

IREN  ·  Vertically Integrated  ·  Sydney, AU
iren.comInvestor relations ↗
Grid powerVertically Integrated NeocloudEx-Bitcoin miner▲ BULLISH · Q3 FY26
$35.45
-12.5% today
5.8
TOTAL GW
0.81
OPERATIONAL
3.39
SECURED
1.60
ANNOUNCED
$12.7B
MKT CAP
$2.2B
VAL / GW
Blended econ. $13.25M/MW-yrContract value $9.7BDemand Microsoft, Nvidia
01

Overview

IREN Limited (formerly Iris Energy) is a Nasdaq-listed operator that built one of the largest contracted power positions in the sector to mine Bitcoin, and is now converting that power and those sites into AI data-center capacity and a vertically integrated AI cloud (IREN Cloud).

Its footprint spans West Texas and British Columbia, with secured grid capacity now extending to Spain (Nostrum) and South Australia (Bundey). Power is largely owned and low-cost, secured through grid-connection agreements signed years before the AI build-out made them valuable. IREN became a domestic U.S. filer (10-K/10-Q) on July 1, 2025.

02

Market Thesis

The scarce asset is firm, energized power near fiber — and IREN owns more of its megawatt than almost anyone in the coverage universe, giving it a low cost per megawatt and most of the upside on its own balance sheet. The market has noticed: the stock has re-rated well off its miner-era multiple.

The story from here is execution, not discovery. Value turns on converting 3.4 GW of contracted power into operational, energized capacity on schedule, and on delivering the Microsoft ($9.7B) and NVIDIA ($3.4B) compute contracts — against heavy convertible-note leverage and reliance on at-the-market equity issuance to fund the build.

03

Approach

IREN owns its grid substations and land, builds the data centers, and runs its own compute layer (IREN Cloud, hardened by the May 2026 Mirantis acquisition) — full vertical integration from power to platform. The ~15-point gap from a pure software neocloud reflects the capital intensity of owning physical real estate and power.

04

Key Sites

SITE
LOCATION
CAPACITY
STATUS
Canal Flats
BC, Canada
30 MW
OPERATIONAL
Mackenzie
BC, Canada
80 MW
OPERATIONAL
Prince George
BC, Canada
50 MW
OPERATIONAL
Childress
Childress, TX
750 MW
SECURED
Sweetwater 1
Nolan County, TX
1.4 GW
SECURED
Sweetwater 2
Nolan County, TX
600 MW
SECURED
Nostrum Portfolio
Spain
490 MW
SECURED
Bundey Campus
South Australia
800 MW
SECURED
Oklahoma Campus
Oklahoma
1.6 GW
ANNOUNCED
05

Risk

Electricity outages or limitations could severely impact operations and financial performance.
Customer concentration and counterparty credit risk in HPC and AI services could lead to significant financial exposure.
Financing terms and leverage could restrict business operations and impact financial condition.
Regulatory changes, especially in ERCOT and grid stability requirements, could disrupt operations and limit expansion.
Construction delays or failures in securing grid connections could hinder expansion plans.
Supply chain issues could delay expansion and increase infrastructure costs.

Developments

Aug 28, 2026BLUE OWL MANAGED FUNDS LEAD $2.4 BILLION AI FACTORY FINANCING FOR IRENPR Newswire
Large-scale financing for an AI factory signals capital flowing to data center buildout, a leading indicator of future contracted power demand.
Aug 17, 2026Iren delivers first phase of AI capacity to Microsoft in TexasData Center Dynamics
IREN's first-phase delivery to Microsoft validates contracted, energized AI capacity in Texas, reinforcing the scarcity of near-fiber power.
also covered by The Block
Aug 13, 2026Current report (8-K)SEC 8-K
First 50MW liquid-cooled AI cloud deployment to Microsoft under a $9.7B contract signals strong demand and financial commitment for high-capacity, AI-optimized data center power.
also covered by GlobeNewswire
Aug 4, 2026Current report (8-K)SEC 8-K
Adds software layer atop IREN’s owned DCs to deepen vertical integration and capture more AI workload economics, but adds zero energized MW to the scarce power thesis.
also covered by GlobeNewswire
Jul 21, 2026IREN’s $2.8B AI Deals Highlight New Funding ModelData Center Knowledge
The $2.8B in AI deals underscores IREN's strategic shift towards monetizing power assets, aligning with the thesis that energized, contracted MW near fiber are the scarce asset.
Jul 20, 2026Current report (8-K)SEC 8-K
IREN's secured contracts and prepayments signal strong demand and financial stability, reinforcing the thesis that energized, contracted MW near fiber are the scarce asset.
also covered by Data Center Dynamics
Jul 20, 2026Iren’s stock surges as the neocloud lands $2.8 billion worth of new dealsMarketWatch
The $2.8B in deals validates hyperscale demand for neocloud services, underscoring the value of contracted power capacity even absent disclosed MW.
also covered by Investor's Business Daily
Jul 20, 2026Hut 8, IREN land billions in new contracts, lifting AI compute stocks MARA, RIOT, WULFCoinDesk
New billions-scale contracts signal hyperscaler demand for IREN’s energized sites, validating the thesis that contracted power near fiber is the scarce asset.
also covered by CoinDesk
Jun 1, 2026Current report (8-K)SEC 8-K
Securing $3.6B in debt for a Microsoft-backed GPU deployment validates that hyperscaler-committed power capacity can attract large-scale, investment-grade-linked infrastructure capital.
May 26, 2026Current report (8-K)SEC 8-K
The deal underscores the strategic importance of securing GPU supply to support large-scale AI cloud contracts, aligning with the thesis that energized, contracted MW near fiber are crucial.
May 14, 2026Current report (8-K)SEC 8-K
IREN's 1% convertible notes provide low-cost capital to fund data-center expansion, a leading indicator of future contracted MW near fiber.
May 11, 2026▲ BULLISHCurrent report (8-K)SEC 8-K
IREN's strategic partnership with NVIDIA and capacity expansion plans underscore the value of secured, energized MW near fiber, aligning with the thesis.
May 11, 2026Current report (8-K)SEC 8-K
Convertible note raise signals capital-market access for power-intensive digital infra, even absent a specific PPA or MW announcement.
also covered by SEC 8-K
May 7, 2026▲ BULLISHIREN reports Q3 FY26 results: $144.8M revenue, $247.8M net lossSEC 8-K
IREN's secured 5GW power portfolio and NVIDIA contract underscore the value of contracted, energized MW near fiber, aligning with the thesis.
also covered by SEC 8-K · SEC 10-Q
All filings on EDGAR ↗
Share on XCompare IRENAll companies